Project

proye3

Infrastructure and Equipment

Terminal Area

Current: 800 mts lineal deck / 10.5 mts depth.

Future: 1,100 mts lineal deck, 400 mts general cargo + passengers, 14-15.50 mts depth.

Annual Capacity

Circa 650,000 TEUS (2013)
1.8 Million TEUS (upon completion))

 

Equipment

  • 4 Mobile Harbor Cranes
  • 6 Spreaders (end 2014)
  • 1 Ship to Shore Crane
  • 3 Straddle Carriers
  • 29 Forklifts
  • 58 Terminals Tractor
  • 62 Chassis
  • 18 Reach Stakers / 1 Front Loaders
  • 5 Powerpacks rentad (220 plugs)
  • 4 Powerpacks (176 plugs) 1500 plugs direct (end 2014)

 